ORDU / ÇAMAŞ
Ordu / Çamaş Mining Project
The project is located within the borders of the province of Ordu at a distance of 31 km to the city. The geology of four adjacent license areas of total 4.718 hectares consists of volcanic-sediment sequences. In the prospecting site, multiple vein type sulphide Cu-Pb-Zn and Au-Ag mineralization is observed extensively.
The Harput Mining Company, which was founded as a Sadioğulları Mining Company, started mining operations in 2013. The mining licensing status of the Ordu Project is consist of 4 adjacent licenses which are three in detail status and one in operation status, total area of 6245 hectares.
A total of 12.343 meters (at 52 diamond drill holes) of core drilling has been completed in the license area. In terms of geophysical works, a total of 24.850 meters IP/RES works have been conducted on 22 lines by Pole-Dipole method.
To determine the distribution of Pb Zn Cu & Au Ag mineralized zones, 3041 laboratory analysis results were evaluated. With present licenses, general geologic mapping have been completed. Resource enhancement studies are continuing. Preliminary ore modeling/resource estimate and metallurgical tests of the area have been accomplished. Detail works for resource enhancement in license area are in progress.